Implementation of the TPM Method to Increase Production Machine Productivity at PT. Cemara Saringan Medan
DOI:
https://doi.org/10.35335/jict.v16i2.275Keywords:
Machine Productivity, Manufacturing Systems, Overall Equipment Effectiveness, Total Productive Maintenance, Web-Based MonitoringAbstract
PT. Cemara Saringan Medan, a medium-scale manufacturer of palm oil filtration components, continues to experience frequent machine downtime and performance inefficiencies that disrupt production stability and increase operational costs. To address these challenges, this study aims to enhance machine reliability and productivity through the implementation of Total Productive Maintenance (TPM) integrated with a web-based monitoring system. Using a waterfall-based research methodology, the study involved data collection, preprocessing, TPM computation (availability, performance efficiency, and quality rate), OEE analysis, UML-based system design, application development, and black-box testing. The results show that the company’s production machines achieved an availability level of 89%, performance efficiency of 83%, and a product quality rate of 96%, indicating that productivity losses are primarily attributed to breakdown-related downtime and cycle-time inefficiencies rather than product defects. The integration of TPM with digital monitoring further demonstrates strong potential to enhance maintenance transparency, reduce human error, and support more responsive decision-making. These findings imply that adopting web-based TPM tools can significantly improve operational control and serve as a scalable foundation for predictive maintenance in medium-scale manufacturing environments.
References
Agung, F. Y., & Siahaan, A. (2020). Overall Equipment Effectiveness (OEE) through Total Productive Maintenance (TPM) practices: A case study in chemical industry. Emerging Markets: Business and Management Studies, 7(1), 23–36. https://doi.org/10.33555/ijembm.v7i1.124
Ardiansyah, M. R., & Nuriyanto, N. (2025). Analisis Total Productive Maintenance (TPM) dengan Menggunakan Metode Overall Equipment Effectiveness (OEE) pada Mesin Blowing. Jurnal Teknik Industri Terintegrasi, 8(3), 3250–3259. https://doi.org/10.31004/jutin.v8i3.47869
Diemsy, A. R., & Apsari, A. E. (2024). Total Productive Maintenance (TPM) pada perawatan mesin jahit menggunakan Overall Equipment Effectiveness (OEE) di CV. Cahaya Setia Mulia. Jurnal Ilmiah Research and Development Student, 3(1), … https://doi.org/10.59024/jis.v3i1.1053
Putra, A. F., & Kusnadi, K. (2023). Penerapan metode Total Productive Maintenance dengan Overall Equipment Effectiveness (OEE) pada mesin grinding di PT. VPRK. Industrika: Jurnal Ilmiah Teknik Industri, 8(4), … https://doi.org/10.37090/indstrk.v8i4.1471
Siswanto, Y., Hidayat, T., & Budi, D. R. S. (2023). Analisis Total Productive Maintenance Overall Equipment Effectiveness Moulding PMS Line. Jurnal Teknologi dan Manajemen, 21(2), 151–160. https://doi.org/10.52330/jtm.v21i2.127
Syahabuddin, A., Yusuf, M., & Zulziar, M. (2023). Analisis Total Productive Maintenance (TPM) dengan Metode Overall Equipment Effectiveness (OEE) pada Mesin Ekstrusi di PT. Polymindo Permata. JITMI (Jurnal Ilmiah Teknik dan Manajemen Industri, 6(1), 42–50. https://doi.org/10.32493/jitmi.v6i1.y2023.p42-50
Muhajir, S. M., & Yuamita, F. (2024). Analysis of Total Productive Maintenance using the Overall Equipment Effectiveness method on the mixing batching machine at PT. Wijaya Karya Beton Tbk Boyolali. Jurnal Inovasi dan Kreativitas (JIKa), 3(1), … https://doi.org/10.30656/jika.v3i1.6048
Muhazir, A., Sinaga, Z., & Pratama, G. A. A. (2022). Analisa Total Productive Maintenance guna meningkatkan produktivitas mesin ekstrusi type 2500 menggunakan metode Overall Equipment Effectiveness (OEE). Journal of Industrial and Engineering System, 3(1), … https://doi.org/10.31599/68mx5c27
Nursubiyantoro, E., Puryani, P., & Rozaq, M. I. (2016). Implementasi Total Productive Maintenance (TPM) dalam penerapan Overall Equipment Effectiveness (OEE). OPSI Journal, 9(1), … https://doi.org/10.31315/opsi.v9i01.2169
Putra, A. (2023). Implementasi Total Productive Maintenance (TPM) dalam penerapan Overall Equipment Effectiveness (OEE) di PT. XYZ. Journal of Community Services in Sustainability, 1(1), 1–8. https://doi.org/10.52330/jocss.v1i1.135
Siagian, D., Gusniar, I. N., & Dirja, I. (2023). Analisis Total Productive Maintenance dengan metode OEE dan FMEA pada mesin extruder GW-350. JPTM (Jurnal Pemeliharaan Total Mesin), 4(1), … https://doi.org/10.37304/jptm.v4i1.5343
Simanjuntak, S. G., Sitompul, S., & Naibaho, W. (2022). Penerapan (TPM) Total Productive Maintenance pada mesin pengupas kulit kacang tanah dengan metode (OEE). Jurnal Pendidikan dan Konseling, 4(6), 3534–3541. https://doi.org/10.31004/jpdk.v4i6.8788
Hafid, B., Siagian, T., Derlini, D., & Silvany, R. (2023). Pengukuran dampak penerapan sistem Total Productive Maintenance terhadap waktu henti mesin. Jurnal Review Pendidikan dan Pengajaran, 7(3), … https://doi.org/10.31004/jrpp.v7i3.29222
Afiansyah, E. D., Priyana, & Hidayat, H. (2025). Analysis of Total Productive Maintenance (TPM) Using OEE and FMEA Methods on Plan-2 Dolomite Fertilizer Production Machine at PT. XYZ. G-Tech, 9(2), 695–704. https://doi.org/10.70609/gtech.v9i2.6595
Putra, A. V., & Ruslan, M. (2020). Analisis penerapan Total Productive Maintenance (TPM) dengan metode Overall Equipment Effectiveness (OEE) pada mesin Kneader (Studi Kasus PT. XYZ). Journal of Industrial and Engineering System, 1(1),


Jurnal ICT : Information and Communication Technologies is licensed under a